Specialized contractor · RBQ 5839-3208-01 · APCHQ · IKO RoofPro 1 877 445-4610 · Credit available

The Rénoclimat program in 2026, work by work

What the program pays per square foot since October 1, 2026, under what conditions, checked against the official sources. With a calculator for your areas. The official documents are in French.

Calculate the estimated grant for your work

The calculator needs JavaScript. The full schedule, work by work, is in the next section: multiply each area by the rate per square foot, then apply the cap for the category.

The Ministry publishes its own calculator as an Excel file with macros. This one fits in the page: check your work, enter your areas, and see the amount the 2026 schedule provides, line by line, with what is missing for the lines that do not count.

Calculation based on the Rénoclimat Participant Guide, 2026 edition, tables 2, 3 and 4 and section 4 (in French). It does not replace the Ministry's decision.

The Toiture & Isolation Provinciale team · Updated

Since October 1, 2026, Rénoclimat pays a grant calculated per square foot insulated, work by work, with no mandatory energy assessment. The work must be done by an RBQ-licensed contractor, who signs a compliance certificate. The Ministry decides every application and pays it by cheque. The calculator on this page applies the official schedule to your areas.

In force
Since October 1, 2026, until March 31, 2029, as long as the budget lasts
How the grant is calculated
Per square foot insulated, by category, at the lesser of the amount paid before taxes and the schedule
Insulation amounts
$0.50 to $3.50 per sq. ft. depending on the work, with a cap per category
Energy assessment
Optional, refunded up to $500 with work that qualifies for the grant
Who does the work
An RBQ-licensed contractor, who signs the compliance certificate
Application deadline
No later than 12 months after the work ends
Where to apply
On the program's portal, under development: it is not open yet
Payment
By cheque, sent by mail

Based on the Rénoclimat Participant Guide, 2026 edition (October 6, 2026), the comparison table on Québec.ca and the News page, rechecked on November 11, 2026. The official documents are in French.

Toiture & Isolation Provinciale is neither the Ministry nor its program. The Ministry decides every application and can change the program.

On this page

The 2026 schedule, work by work

The grant is the lesser of two amounts: what you paid for the work, before taxes, and the amount in the schedule. It is calculated per square foot insulated, by category of work, provided you exceed the minimum area and reach the R-value in the table. Each category has a cap, and the total energy efficiency grant does not exceed $21,500 for a house or $31,000 for a duplex, a triplex or an apartment building.

Insulation grant, according to the 2026 Participant Guide
WorkR-value to addMinimum areaGrantCap
AtticR-20, for a total of R-60300 sq. ft.$1.75 per sq. ft.$2,000 for a house, $5,000 for a plex, whole roof
Cathedral or flat roofR-20, for a total of R-40300 sq. ft.$1.75 per sq. ft.Within the roof cap
Exterior wallsR-9300 sq. ft., without doors or windows$3.50 per sq. ft.$7,000 for a house, $11,000 for a plex
Basement walls, rim joist includedR-15300 sq. ft., without openings$2.50 per sq. ft.$2,500 for a house, $3,500 for a plex, foundations and floors together
Basement slabR-3300 sq. ft.$0.50 per sq. ft.Within the foundations and floors cap
Crawl space walls, rim joist includedR-23300 sq. ft.$3.50 per sq. ft.Within the foundations and floors cap
Floor above the crawl spaceR-23300 sq. ft.$3.50 per sq. ft.Within the foundations and floors cap
Exposed floorR-23150 sq. ft.$3.50 per sq. ft.Within the foundations and floors cap

Rénoclimat Participant Guide, 2026 edition (in French), tables 2, 3 and 4 and section 4. The guide does not define an “exposed floor”: we read it as a floor above an unheated space or the outdoors, such as the ceiling of a garage under a heated room.

The recognized insulation values are those of the Building Code or of the CCMC Registry of Product Assessments. Manufacturers' values count if they come from recognized test methods. The program also pays for other measures, which we do not do: ENERGY STAR “Most Efficient” windows ($300 per opening, up to $4,500 for a house), a fixed battery (up to $4,000) and the connection of a backup power source (up to $1,000). The energy assessment is now optional: it is refunded up to $500, only if it comes with work that qualifies for the grant.

With spray foam, which thickness opens the grant

Rénoclimat names no insulation: spray foam counts if it reaches the R-value in the table. At about R-6 per inch, according to the technical sheet of the product we install (CCMC report 14505-L, CAN/ULC-S770 test), here is the thickness you need on a surface with no insulation in place.

The spray foam thickness that reaches the schedule
WhereR-value to addSpray foam, at about R-6 per inchGrant per sq. ft.
Basement wallsR-15About 2½ in.$2.50
Crawl space wallsR-234 in.$3.50
Floor above the crawl spaceR-234 in.$3.50
Exposed floorR-234 in.$3.50
Exterior wallsR-9From 2 in.$3.50
Cathedral or flat roofR-40 in total7 in. when nothing is in place$1.75

Schedule: 2026 Participant Guide, tables 2, 3 and 4. Thicknesses: a calculation at about R-6 per inch (R-11.7 at 2 in., R-18.5 at 3 in., R-25.6 at 4 in. according to the product sheet), which we confirm in writing before the work.

It is a calculation, and the on-site measurement confirms it: half an inch too much or too little changes the result. At 3 in., a crawl space wall gives R-18 and R-23 is required: the grant is zero. At 4 in., it is $3.50 per square foot. Same in a basement: 2 in. give R-12 and 15 is required. The attic is brought to R-60 with blown insulation (see attic insulation), and LogisVert does not cover spray foam, even in the attic: for spray foam, it is Rénoclimat.

Indoors, spray foam is covered with a compliant thermal barrier, drywall for example. Our spray foam work is warranted for 2 years, and the product is covered by its manufacturer; the details are on our warranty page.

Basement foundation wall sprayed between wood strapping, with the rim joist sprayed at the top
A foundation wall sprayed between the strapping, the rim joist sprayed at the top. The rim joist counts with the walls.

We have a page for each spot: basement insulation, crawl space insulation and rim joist insulation. Our guide to spray foam in a basement or crawl space explains the method.

A job from November 10, 2026, with the numbers

A four-season cottage in Mauricie, over a crawl space. The block walls were bare, with the glue left by an old rigid insulation that had come off, and the floor above stayed cold. On November 10, 2026, we removed the old insulation, decontaminated one section under the bathroom, then sprayed 4 in. of spray foam on 416 sq. ft. of walls and 104 feet of rim joist.

Crawl space before the work: a wooden post in the middle, bare block walls with the glue left by the old insulation, soil on the ground
BeforeBare block walls, glue left by the old insulation.
The same crawl space after the work: the walls sprayed all around, under the joists
AfterThe walls sprayed all around. On the ground, the old insulation panels.
A bare block wall of the crawl space before the work, with rigid insulation panels on the ground
BeforeA bare wall, the old insulation on the ground.
A crawl space wall sprayed under the joists, after the work
AfterA sprayed wall, right up under the joists.

Under the 2026 schedule, crawl space walls and their rim joist give $3.50 per square foot from R-23 added, and 4 in. of spray foam gives about R-24. The calculation: 494 sq. ft. × $3.50 = $1,729, which Québec rounds up to $1,730, a little more than half of the invoice before taxes.

The calculation for this job

Invoice, before taxes
$3,171
Crawl space walls4 in. of spray foam, about R-24 (the schedule requires R-23)
416 sq. ft.
Rim joist104 feet, counted at 0.75 sq. ft. per foot
78 sq. ft.
Area that countsMore than 300 sq. ft., the category minimum
494 sq. ft.
Schedule rateCrawl space walls, rim joist included
$3.50 per sq. ft.
Estimated grant under the schedule494 sq. ft. × $3.50
$1,730
Share of the invoice before taxesA little more than half
55%

At 3 in., the same job would have qualified for nothing: R-18, and R-23 is required. The application is made on the program's portal when it opens, with the itemized invoice and the compliance certificate we sign.

These are amounts provided by the schedule, not amounts paid: the application portal is not open yet. Here are other spray foam jobs from this fall, with their estimated grant.

Other jobs from this fall
Where, whenWorkInvoice before taxesEstimated grant under the scheduleShare
Québec City, November 2026Basement foundation walls, 1,050 sq. ft. at 2½ in.$3,777$2,500, the cap66%
Montréal South Shore, November 2026Basement walls, 850 sq. ft. at 2½ in., and rim joist, 60 feet$3,129$2,24072%
Lanaudière, October 2026Basement walls, 765 sq. ft. at 2½ in., and rim joist, 100 feet$2,965$2,10071%
Mauricie, October 2026Basement walls, 775 sq. ft. at 3 in.$3,451$1,94056%
Montérégie, October 2026Floor above a crawl space, 616 sq. ft. at 5 in.$3,427$2,16063%

Approved TIP installation reports, November 2026. No names, no addresses. Each grant is calculated under the 2026 Participant Guide schedule; none has been paid yet.

In this table, the estimated grant is 55% to 72% of the invoice before taxes, which is on the high side. Across all our spray foam jobs this fall where Rénoclimat applies, it most often covers 40 to 60% of the invoice before taxes. The price of a job depends on its area, the thickness and the access: we set it after measuring.

What makes you lose the grant

Seven pitfalls. We saw the first four on real quotes this fall, and the calculator above flags the first three.

  • A thickness that is too thin. 3 in. on the walls or floor of a crawl space give R-18, and R-23 is required: nothing. At 4 in., $3.50 per square foot. 2 in. on a basement wall give R-12, and 15 is required.
  • Under 300 sq. ft. And 150 sq. ft. for an exposed floor. A 286 sq. ft. wall gets nothing; with the rim joist, it passes.
  • The rim joist alone. 130 feet of rim joist make about 98 sq. ft., far from the 300 required. It counts with the walls.
  • A garage. Its walls do not count. Its ceiling counts only under a heated room, as an exposed floor, from 150 sq. ft.
  • Work done yourself, a foam kit, or a contractor whose RBQ licence does not match the work.
  • An addition, a house under 5 years old, a three-season cottage.
  • An application filed too late (more than 12 months after the work ends), or without the contractor's signed certificate.

2026 Participant Guide, sections 2.2 to 2.6 and appendix 1. The first three pitfalls are decided by the areas and the thickness; the others come from the conditions below.

The conditions

The conditions of the insulation grant
ConditionWhat the guide says
Who appliesThe owner. In a divided co-ownership (a condo), it is the syndicate of co-owners.
Which homeA detached, semi-detached or row house, including a mobile home and a four-season cottage, a duplex, a triplex or a building of four or more units. At most three storeys above ground and 600 m² (6,458 sq. ft.) of footprint, more than 50% residential.
Since whenBuilt and lived in for at least 5 years at the time of the application.
Livable year-roundHeating that holds 21 °C in winter, permanent foundations, the electricity grid, drinking water, a sewer or a septic tank. A three-season cottage or an off-grid building does not count.
ResidenceFor insulation, a primary or secondary residence, or a duplex, a triplex or an apartment building.
Which contractorRegistered with the Registraire des entreprises, with an RBQ licence whose category and subcategories match the work exactly, who signs the compliance certificate. Our licence: RBQ 5839-3208-01.
What is excludedAn addition, work done yourself, work done before October 1, 2026.
One grant per categoryRoof, exterior walls, foundations and floors: a category already paid or refused cannot be applied for again. You can come back for another category.
CombiningNo combining with aid from another ministry, agency or Crown corporation of Québec or Canada, tax credits included.

2026 Participant Guide, sections 2.1 to 2.4 and 2.8, definitions of section 2.2 and table 1.

Making the application, step by step

Before the work

  1. Have the area and the thickness checked

    In the quote, every area and every thickness must reach the schedule of its category. This is where a 286 sq. ft. wall or a crawl space at 3 in. loses the grant. Ask for them to be measured on site.

  2. Choose a contractor whose licence matches

    The RBQ licence must match the work exactly. You can check it in the Régie du bâtiment du Québec register. Ours is 5839-3208-01.

During the work

  1. Keep photos

    The program asks for photos of the work. We take them before, during and after, and we hand them to you.

After the work

  1. Keep the itemized invoice and the certificate

    The invoice details the areas, the thicknesses and the R-values. We fill in and sign the compliance certificate, and hand it to you with the invoice.

  2. Sign up for the portal launch notice

    The application portal is under development and is not open yet. The News page on Québec.ca lets you sign up for the launch notice (in French).

The application

  1. Apply on the portal

    You need the property assessment roll, the itemized invoices, the contractor's compliance certificate and photos of the work.

    No later than 12 months after the work ends
  2. The cheque arrives by mail

    The grant is paid by cheque. Your social insurance number is requested for the RL-27 slip. No processing time is announced, and the Ministry may check the work up to 12 months after payment.

2026 Participant Guide, sections 3.2 to 3.4, 2.6 and 2.9, appendix 1; News page on Québec.ca, updated October 13, 2026.

The application, document by document: how a Rénoclimat application works.

What changed on October 1, 2026

Older articles describe the old program: two mandatory assessments, flat amounts, work you could do yourself. If a page tells you “$250 to $2,500” for the basement, check its date.

Rénoclimat, before and since October 1, 2026
WorkBeforeSince October 1, 2026
Energy assessmentsTwo, mandatoryNone mandatory
Who does the workThe owner could do itAn RBQ-licensed contractor, with a certificate
Basement walls$1,250 (R-10 to R-23 added) or $2,500 (more than R-23), pro rata, on 20% of the surface$2.50 per sq. ft. from R-15 added, 300 sq. ft.
Rim joist$250 (80% of the surface, more than R-20)Counted within the basement or crawl space walls
Crawl space walls$1,000 or $2,000$3.50 per sq. ft. from R-23 added
Floor above the crawl space$500$3.50 per sq. ft.
Exposed floor$380$3.50 per sq. ft., 150 sq. ft.
Exterior walls$2,250 or $3,750$3.50 per sq. ft. from R-9 added, up to $7,000
Attic$1,500 at most, depending on the insulation in place$1.75 per sq. ft. brought to R-60, up to $2,000
Basement slabNothing$0.50 per sq. ft. (R-3)
Cap for a house, all measures$20,000$21,500

Comparison table of the old and new criteria on Québec.ca (PDF of November 3, 2026); 2026 Participant Guide.

The old program applies only to those who requested their energy assessment before October 12, 2026, with the after-work assessment done by March 31, 2027. For everything else, it is the per-square-foot schedule.

Rénoclimat or LogisVert

LogisVert, from Hydro-Québec, pays for a blown roof and caulking on an electrically heated house: $1,500. Rénoclimat pays for all the rest of the insulation, an attic brought to R-60 included, and it is the one that pays for spray foam.

Never both for the same work: Hydro-Québec is a Crown corporation, and the Rénoclimat guide refuses combining with aid from a Crown corporation. For different work, for example LogisVert for the attic and Rénoclimat for the basement, nothing is promised: have it confirmed at 1 866 266-0008. Our grants guide compares the two for an attic.

FAQ

Your Rénoclimat questions

Does Rénoclimat pay for spray foam insulation?

Yes, if the thickness reaches the R-value in the table. Rénoclimat names no insulation: spray foam counts like any other. At about R-6 per inch, you need about 2½ in. on a basement wall and 4 in. on a crawl space wall or floor. It is a calculation we confirm before the work. LogisVert, for its part, does not cover spray foam.

How much does Rénoclimat pay for basement insulation?

Basement walls, rim joist included, give $2.50 per square foot from R-15 added, starting at 300 sq. ft. The slab gives $0.50 per square foot from R-3. Foundations and floors together have a cap of $2,500 for a house and $3,500 for a duplex, a triplex or an apartment building.

Do I still need an energy assessment?

No. Since October 1, 2026, no assessment is mandatory, before or after the work. It remains possible: it is refunded up to $500, only if it comes with work that qualifies for the grant. What is added is the RBQ-licensed contractor and their signed compliance certificate, along with the itemized invoice.

Can I do the work myself?

No. Since October 1, 2026, the work must be done by a contractor registered with the Registraire des entreprises, whose RBQ licence matches the work exactly. The contractor fills in and signs the compliance certificate. Work done by the owner, with a foam kit for example, qualifies for no grant, nor does work done before October 1, 2026.

Is the application portal open?

Not yet. According to the News page on Québec.ca, updated October 13, 2026, the portal is under development and will be made available to participants during the fall. You can sign up for the launch notice. Meanwhile, keep the itemized invoice, the certificate signed by the contractor and photos of the work.

Is my cottage covered by Rénoclimat?

Yes, if it is a four-season cottage: livable year-round, with heating that holds 21 °C in winter, drinking water, a sewer or a septic tank, permanent foundations, and built and lived in for at least 5 years. A three-season cottage is excluded. For insulation, a secondary residence is accepted.

Can Rénoclimat and LogisVert be combined?

Never for the same work. Hydro-Québec is a Crown corporation, and the Rénoclimat guide refuses combining with aid from a Crown corporation of Québec or Canada. For different work, such as LogisVert for the attic and Rénoclimat for the basement, nothing is promised: have it confirmed at 1 866 266-0008 before you start.

Does the rim joist alone qualify for the grant?

In practice, no. The rim joist counts with the basement or crawl space walls, and on its own it is too small. For example, 130 feet of rim joist make about 98 sq. ft., well under the 300 sq. ft. required. Added to 286 sq. ft. of walls, it brings them past the minimum. The calculator on this page adds it to the walls.

What spray foam thickness for a crawl space?

4 in. for the walls or the floor, about R-24 at R-6 per inch, while the program requires R-23 added. At 3 in., you get R-18 and the grant is zero. The schedule is then $3.50 per square foot, starting at 300 sq. ft. It is a calculation, which we confirm before the work.

How long do I have to apply?

No later than 12 months after the work ends. You need the property assessment roll, the itemized invoices, the contractor's signed compliance certificate and photos of the work. The grant is paid by cheque, by mail. No processing time is announced. The Ministry may check the work up to 12 months after payment.

Is a duplex or a triplex covered?

Yes, for insulation, with higher caps: $5,000 for the roof, $11,000 for exterior walls and $3,500 for foundations and floors. The total does not exceed $31,000, against $21,500 for a house. A condo goes through its syndicate of co-owners, and a building of four or more units is also covered.

What is the maximum Rénoclimat grant?

For a house, each insulation category has its cap: $2,000 for the roof, $7,000 for exterior walls, $2,500 for foundations and floors. All the program's measures together, windows included, cannot exceed $21,500 for a house or $31,000 for a duplex, a triplex or an apartment building. And the grant never exceeds the amount paid before taxes. The calculator applies these rules.

Official sources

Verified on November 11, 2026. We check this page again with every update of the guide. The decision belongs to the Ministry, which can change the program. The official documents are in French.

Have your areas measured before choosing the thickness

An expert measures every surface on site, confirms the thickness that reaches the schedule and hands you the quote. Taken care of within 5 minutes, visit within 24-48 h.

Request a visit 1 877 445-4610

The decision belongs to the Ministry, and the program can change.